See a complete factory for HDPE portable toilet housings working in 3D, from thermoforming and trimming to welding and assembly. Check the cost per toilet and payback for your country, then send the plan to us for a quotation.
Supplied planner perspective · illustrative factory study, not an installed line.
Illustrative proposed application, not an installed factory or approved production specification. Part geometry, machine configuration, tooling, material, joining, safety and output require engineering review. The supplied PF1-X-2515 study is not a released catalogue model or a confirmed machine recommendation. Planner figures are illustrative assumptions, not guarantees or a quotation.
Three walls, a roof, a door and a door frame, thermoformed from 4 mm UV-stabilised HDPE (roof 6 mm). The door and frame are two-sheet parts joined by ultrasonic welding. The rotomoulded base and holding tank with commode are bought in from a supplier.
Supplied product planner illustration · dimensions and gauges remain illustrative study assumptions.
Machinecraft PF1-X-2515 thermoformers with quick tool change; CNC routers (1500 × 3000 mm) that trim the parts and drill the fixing holes; a granulator for regrind; ultrasonic welding stations for the door and frame; riveted assembly stands and a finished-goods yard. Three sizes: L (1 former, about 24 housings a day), R (2 formers, about 49) and H (3 formers, about 73), on three shifts.
The 24/49/73 housings per day, three-shift operation and PF1-X-2515 configuration are supplied illustrative concept assumptions, not output guarantees, a quotation or a released model recommendation. Cost and payback assumptions are available only in the email-verified planner.
Tell us your volumes and site, and we'll send a layout and a quotation.
The supplied model treats left, right and back walls, a roof, and the door and frame skins as separate parts. Tool campaigns and QTC changes show why a housing needs more than one forming operation.
Follow the sheet autoloader, clamping, zoned sandwich heating, female-tool vacuum forming, cooling and release. The roof includes a source-model plug-assist concept.
A decline conveyor transfers formed parts to the router. An operator places them in part-specific vacuum trim fixtures for outlines and openings; the remaining skeleton is separated for regrind.
The door and door frame each use separately formed A and B skins. Explore the supplied ultrasonic spot-welding concept or the alternative adhesive-bonding and cure-rack workflow; joining needs material and process trials.
Bring the three walls, roof, joined door and joined frame together from part-specific stocks. The supplied model treats the base and commode as bought-in, rotomoulded components, not products formed by this line.
Machinecraft will review your proposed forming route, identify information still needed, discuss relevant machine options and downstream scope, and agree the next engineering step.
Your enquiry remains editable. Leave unknown information unanswered; nothing is sent until you submit. Share detailed CAD directly with the team after the initial review.
Planner access is email verified; public product and process information remains available above.