Starting assumptionsThe starting scenario is 30,000 workload-equivalent packages/year across 288 days/year, 3 shifts/day and 7.5 hours/shift, with 70% forming/trim OEE and zero extra setup. A package is the model's workload unit—not one individual part, a complete vehicle kit or a verified shipment.
CalculationStart with 288 days/year × 3 shifts/day × 7.5 hours/shift = 6,480 scheduled hours/year. At the assumed 70% forming/trim OEE and zero extra setup, that is 272,160 effective minutes/year per forming input. The calculation uses 58.7917 model-work minutes/package (full precision retained in the source result; rounded here for display); it does not use the 150-second animation as a production cycle. With six forming inputs, the unchanged full-precision calculation gives 27,775.365 raw packages/year, then 27,775 after rounding down.Read the displayed starting assumptions and keep the unit as workload-equivalent packages/year—not individual parts, complete vehicle kits or verified shipments.Compute the calendar denominator: 288 × 3 × 7.5 = 6,480 scheduled hours/year; apply 70% OEE once to forming and trim.For each stage, divide count × annual effective minutes by that stage's model work denominator; keep the full precision until the final floor.Compare the floored process ceiling with transport capacity and the 30,000-package scheduled target; the smaller result is the modelled ceiling.Change only trimming from 24 to 30, keep forming and every other input unchanged, then check whether the constraint and ceiling move before drawing any engineering conclusion.
ResultThe supplied default scenario asks for 30,000 workload-equivalent packages per year. PF1 forming limits the calculated annual ceiling to 27,775: a 2,225-package gap. A package is the model's workload unit—not one individual part, a complete vehicle kit or a verified shipment.
Effect of changing an inputReproduce the sensitivity by changing only one input: set trimming from 24 to 30 and leave every other displayed default and the supplied part data unchanged. Displayed raw trim capacity moves from about 35,946 to about 44,932 (supplied full-precision result: 44,931.99405012084), while forming stays at 27,775.365 raw (27,775 floored). The default supplied trim result is 35,945.59524009667 before display rounding. The overall ceiling therefore remains 27,775 and forming remains the constraint. This is a sensitivity check, not an equipment quantity.
LimitationsFor your own factory, review the actual forming workload, tooling, loading, changeovers and quality allowance first. Then balance trimming, joining and transport against that agreed input. Faster downstream operations cannot supply the work that the forming stage has not produced.